Why Brands use TEKPAKS
TEKPAKS creates factory-ready technical documentation that reduces mistakes, improves factory communication, and supports more consistent development.
-
Clear spec sheets and grading
-
Defined tolerances and measurement standards
-
Documentation built for factory use
-
Fewer sample revisions
-
More consistent production outcomes
Why TEKPAKS Works Better
TEKPAKS applies structured grading, tolerance, and measurement standards to create documentation factories can follow more clearly.
-
Consistent sizing architecture across categories
-
Defined tolerance logic to reduce mistakes
-
Clear measurement standards for factory use
-
Structured fit tiers for predictable scaling
-
Documentation built to reduce sampling confusion
What TEKPAKS Delivers
TEKPAKS delivers the technical documentation and development structure needed to move garments from concept to production with more clarity and control.
-
Factory-ready tech packs
-
Grading and sizing systems
-
Measurement specifications and tolerances
-
Construction callouts and documentation
-
Vendor-ready documentation
Tech Pack Templates & Starter Files
Production-formatted templates built to match real factory documentation standards and accelerate early-stage workflows.
What’s included:
• Industry-formatted tech pack layouts
• Measurement table templates
• BOM and trim framework files
• Construction annotation and callout layouts

Production-Ready Tech Packs
Production-ready tech packs built to eliminate factory confusion and reduce sampling errors.
Included in every tech pack:
• Factory-ready technical flats and construction callouts
• Measurement specifications with tolerances
• Fabric, trim, and BOM documentation
• Production calendar and ownership metadata
• Vendor-ready formatting standards
Turnaround typically 5–10 business days per style. Factory communication support included during sampling.
Tech Pack Repair & Optimization
Turn unclear or rejected tech packs into factory-ready manufacturing documents.
What’s included:
• Measurement corrections and grading cleanup
• Construction clarity improvements
• Missing specification completion
• BOM and trim documentation fixes
• Factory formatting optimization
Typical turnaround: 2–5 business days depending on file condition.
Vendor Matchmaking & Introductions
Production-formatted templates that accelerate early-stage development and documentation setup.
What’s included:
• Factory shortlisting based on your product category and target order volume
• Direct introductions to qualified manufacturers
• Sampling and production readiness guidance
• Risk screening and factory communication support
Matching process typically completed within 3–7 business days depending on project scope and complexity.
